When a project problem appears, record what happened and keep its updates together. The download on this page is a project issue log sheet in the older Microsoft Word .doc format. It has a short project description and a table for issue number, date, description and priority. Use it for a simple record of open questions, client correspondence or decisions that need follow-up.
Preview and download the issue log

Download project log sheet (ZIP)
Contains log-sheet-template.doc
What the sheet records
At the top, enter the project name, start date, end date if known and a brief description of the work. The table then captures each issue or update. The sample instructions say to number new issues sequentially, place the newest row above older rows, leave the issue-number cell blank for a continuation of the issue immediately below it, and add the contributor’s name to the end of the description. Its priority scale runs from 1 (lowest) to 10 (highest).
That layout is deliberately compact. It can work for a small project or a printed discussion log, but it is not an automated tracker. If updates to several issues are interleaved, write the related issue number in each update’s description or adapt the table so the connection stays clear after sorting or moving rows.
Use the issue log consistently
- Start with an actual issue. Describe a problem that has occurred, its effect on the work and the decision or action needed. A possible future problem belongs in a risk plan until it happens.
- Give it one reference number. Use a unique number for the issue, then connect later updates to it. Replace the sample “00” instead of continuing the demonstration record.
- Date and attribute each update. State what changed, who reported or decided it, and any next action. Keep one update in one description cell, as the sample directs.
- Agree on priority. The file’s 1–10 scale is just a convention. Define what the levels mean to your team and revise a score when the impact or urgency changes.
- Record the outcome. Add a final note with the resolution and date. For active management, consider adding owner, target date and status columns to the Word table.
For example, an issue description could read: “Client has not confirmed the revised page list; publication is waiting on approval. Mira to request a decision by Friday. — Sam.” Put the real date and agreed priority in their columns, then add a later dated entry when the decision arrives. This example is suggested usage, not content in the download.
Editing and printing the older Word file
Download and extract the ZIP, open the DOC in Microsoft Word and save a working copy, preferably in DOCX format if that suits your team. Replace the old dates, project description and example row. Add rows carefully so the table headers and column widths remain usable. Review the full document in Print Preview after editing, especially if descriptions become long.
Frequently asked questions
Is this a general daily activity log?
No. Its title and columns are designed for project issues and their updates. You can change the headings, but the included instructions are specific to issue numbering and priority.
Does the file calculate priority or track status automatically?
No. It is an editable Word table. You enter priorities manually, and there is no built-in status or automatic reminder field.
What is the difference between an issue and a risk?
An issue is a problem or question you are dealing with now; a risk is something that might happen later. If an anticipated risk occurs, note the actual event and response in the issue log.
To summarize progress and decisions for a wider audience, compare our project status report templates. Use the meeting minutes templates to record a discussion in more detail.